Marsh Creek Road Safety Improvements – 2.2 mile west of Deer Valley Road

Project Description
Project No.: 0662-6R4025

Federal No.: HRRRL-5928(095)
Project Description:  The work to be done generally consists of realigning the existing curve, both horizontally and vertically. A 22 foot wide detour road will be built south of existing project to detour traffic off the existing road prior to realignment work begins.  A steel crib wall and Midwest guardrail system will be installed off the new north edge of paved shoulder. Work also includes drainage ditches, driveway culverts, signing, striping and utility coordination for utility to relocate a 4 inch CCWD waterline and AT&T joint poles, and temporary removal of a call box.
General Location: Marsh Creek Road, 2 mile east of Deer Valley Road
Supervisory District: #4         
Thomas Brothers Map Reference: 615/D-7    
Contractor: Granite Rock Company               
Resident Engineer: Eric Lilly
Phone: (925)325-3868
Funding Source: State Proposition 1B, High Risk Rural Road (HR3), Local Road Funds            
Working Days: 80
Start Date: July 20, 2015
Estimated Completion Date: November 4, 2016