Rodeo and Pinole Creek Bank Erosion Repairs

Project Information

Project No.:  6D9N03 & 6d9878          

Project Description:  The work to be done generally consists of erosion repairs at three locations including two repair sites on Rodeo Creek and one on Pinole Creek.  The repairs will include excavation, soil off-haul, import fill, rock slope protection, water diversion, and cofferdams.

  • General Location: Rodeo Creek in Rodeo and Pinole Creek in Pinole
  • Supervisory District:  1, & 5
  • Location:Pinole Creek (PDF)   Rodeo Creek (PDF)
  • Contract Cost (Est.): $342,000    
  • Project Engineer: Jenna Caldwell
  • Bid Due Date: November/December 2022
  • Working Days: 60
  • Construction Date: Spring/Summer 2023
  • Funding Source: Flood Control Zone Funds

Project Links

  • Notice to Bidders (PDF)
  • Zoom Prebid Meeting Registration Link
  • Planroom
    • PS&E package
    • Bidders List
    • Q&A
  • Bid Opening Link
  • Bid Results (PDF)

Outreach Program: The bidder shall make a “Good Faith Effort”, and document this effort, to obtain sub-bid participation by MBE’s, WBE’s, OBE’s, SBE’s and LBE’s in accordance with the project special provisions to be eligible for award.  Bidders that have not attended a pre bid meeting in the last 12 months should attend the County pre bid meeting noted in the Notice to Contractors.  The pre bid meeting will include an overview of the Outreach Program requirements and staff will be available to answer your questions.